-->

Newbuilding 469 - ALTAIRE

MAIN DIMENSIONS:

Length overall:​

79,95 m

Length between pp:

72,80 m

Breadth moulded:

17,50 m

Depth main deck:

6,60 m

Depth shelter deck:

9,30 m

Tonnage app:

3700 GT

CLASS:

​DNV-GL +1A Fishing Vessel E0 Ice-C

MAIN ENGINE:

​Wartsila 12V31

kW

GEARBOX/PROPELLER PLANT:

Wartsila

d4200mm​

AUXILIARIE ENGINES:

2 x Wartsila 12V14

864 kWe

1 x Scania DI09 074M

204 kWe

SHAFT ALTERNATOR:

Marelli​

3300 kW

THRUSTERS:

2 x Brunvoll

1400 kW

 kW

DECK EQUIPMENT:

Winches: Karmøy Winch, hydraulic

Cranes: 

RSW-PLANT

2 x Johnson Controls​

1500 kW​

VACUUM SYSTEM:

C-Flow, 2 tanks, 4 compressors @ 90 kW​

CAPACITIES:

RSW tanks:

2875 m3

Fuel oil:

599 m3

Fresh water:

75 m3

SPEED:

App​ 17,0 kn

ACCOMODATION:

16 pers.​

DESIGN:

Karstensens Skibsværft A/S

OWNERS:

​Altaire Fishing Co Ltd, Shetland Islands, UK

HOMEPORT:

Lerwick, Shetland Islands, UK​

DELIVERY:

May 2023​

News​

Pressemeddelelse - 10.06.25 - Forslag til nye flådeskibe til Forsvaret
Forslag til nye flådeskibe til Forsvaret – første enhed leveres i 2030
Read more
#477 - 75,10 M SNURPER / TRAWLER - "HAVFISK" HANDOVER
Newbuilding #477 “HAVFISK” was handed over to owners Havfisk AS / Veibust Fiskeriselskap on May 12th, 2025 from Karstensen Shipyard. The hull for “HAVFISK” was built by Karstensen Shipyard Poland in Gdansk while the rest of the construction has been carried out in Skagen, Denmark..
Read more
#475 – 75,40 m PURSER/TRAWLER - “HÁKON” Hand over
Newbuilding 475 “HÁKON” was handed over to owners Gjögur p/f, Iceland on 10 October 2024 from Karstensen Shipyard. The hull for “HÁKON” was built by Karstensen Shipyard Poland in Gdansk.
Read more

​Karstensens Skibsværft A/S

Vestre Strandvej 17

9990 Skagen

Phone: +45 9844 1311

Cvr.nr.: 10859581

Are you searching for something specific?